Gym and Pool Progress; First 10 WEA Residents
Friday, June 29th, 2007We visited the building yesterday for our second walk-throughs and found a lot was new:
- As we were entering the front of the building, we peeked inside the gym and saw that gym equipment was being set up. Treadmills were lined up at the far end of the gym, while weight machines and free weights were being unsheathed from their plastic covers. The floor was a soft, rubbery tile that is pleasing to the step. We expect that the gym is probably in work-outable condition today.
- The pool is filled with water and looks even nicer than the picture on the 10wea.com website. It felt warm and pool-like in there, which made us feel like taking a swim (No time for that, of course). The only thing left to be finished in there is a rail next to the stairs.
- As we were doing our second walk-through, we learned that yesterday was the building’s first closing. We will be closing on Monday, and will be among the building’s first residents. We met the concierge in the lobby, but weren’t sure if there were any other staff there as of yet.
More updates to come…

